{"id":20106,"date":"2026-03-19T14:42:15","date_gmt":"2026-03-19T13:42:15","guid":{"rendered":"https:\/\/www.mattiaqua.de\/?p=20106"},"modified":"2026-08-10T09:19:49","modified_gmt":"2026-08-10T07:19:49","slug":"renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season","status":"publish","type":"post","link":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/","title":{"rendered":"Maaraue Outdoor Swimming Pool: A New Chapter"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">(The image shows a model view of the project)<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The historic pool will be ready for the future by 2026.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Opened in 1965 and listed as a historic building, the Maaraue outdoor swimming pool is showing significant structural defects after more than 60 years of operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For these reasons, mattiaqua has decided to carry out a complete refurbishment of the pool structures, the water treatment system, the electrical installations and the green spaces adjacent to the pool facilities.<\/p>\n\n\n\n<p class=\"mb-5 wp-block-paragraph\">The new water treatment technology will significantly reduce water, electricity and chemical consumption, thereby conserving resources. The swimming pools will be lined with stainless steel, which ensures sustainability and durability, and is significantly easier to maintain than the familiar tiled pools. The water area in the non-swimmer pool will be redesigned and expanded to include a spray park. However, the charm of the listed swimming pool will be preserved, and the outdoor pool will continue to be a magnet for water lovers and recreational athletes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Part 1 of the refurbishment project<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The demolition of the areas surrounding the pool and the adjacent green spaces has been completed. All pool fixtures, such as entry ladders, starting blocks and handrails, have been removed. The old overflow channel has also been sawn off the pool structure. In future, the water level here will be at the same height as the pool surround, providing an unobstructed view from the pool across the Rhine to Mainz.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The next step will be the dismantling of the old pool water treatment equipment, after which the structural work will begin.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped mb-5 wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image\"><img data-dominant-color=\"888c8d\" data-has-transparency=\"false\" style=\"--dominant-color: #888c8d;\" loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"700\" sizes=\"auto, (max-width: 1800px) 100vw, 1800px\" data-id=\"20099\" src=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Sprungturm.webp\" alt=\"protec architekten ingenieure\" class=\"wp-image-20099 not-transparent\" srcset=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Sprungturm.webp 1800w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Sprungturm-500x194.webp 500w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Sprungturm-1024x398.webp 1024w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Sprungturm-768x299.webp 768w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Sprungturm-1536x597.webp 1536w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Sprungturm-380x148.webp 380w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Sprungturm-320x124.webp 320w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Sprungturm-244x95.webp 244w\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img data-dominant-color=\"a0886c\" data-has-transparency=\"false\" style=\"--dominant-color: #a0886c;\" loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"700\" sizes=\"auto, (max-width: 1800px) 100vw, 1800px\" data-id=\"20097\" src=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Nichtschimmer_Becken.webp\" alt=\"protec architekten ingenieure\" class=\"wp-image-20097 not-transparent\" srcset=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Nichtschimmer_Becken.webp 1800w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Nichtschimmer_Becken-500x194.webp 500w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Nichtschimmer_Becken-1024x398.webp 1024w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Nichtschimmer_Becken-768x299.webp 768w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Nichtschimmer_Becken-1536x597.webp 1536w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Nichtschimmer_Becken-380x148.webp 380w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Nichtschimmer_Becken-320x124.webp 320w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_Nichtschimmer_Becken-244x95.webp 244w\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Part 2 of the refurbishment project<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In the basement, one of the four former filter chambers has been opened up. To do this, the wall had to be cut open and the old filter bed removed. Modern suction filters will be installed here in future.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The former paddling pool has also now been dismantled, so that the next phase of construction work and the landscaping of the surrounding outdoor area can begin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the same time, demolition work in the basement is in full swing. All the old pool water treatment equipment has been dismantled and removed to make way for the new technical installations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With the construction crane now in place, the next phase of the project is set to begin: the structural work. Another milestone will follow from mid-August 2026, when the installation of the new stainless-steel pools begins.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img data-dominant-color=\"7189a6\" data-has-transparency=\"false\" style=\"--dominant-color: #7189a6;\" loading=\"lazy\" decoding=\"async\" width=\"1772\" height=\"1329\" sizes=\"auto, (max-width: 1772px) 100vw, 1772px\" data-id=\"21102\" src=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_03.webp\" alt=\"Kran auf einem Baugel\u00e4nde\" class=\"wp-image-21102 not-transparent\" srcset=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_03.webp 1772w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_03-500x375.webp 500w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_03-1024x768.webp 1024w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_03-768x576.webp 768w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_03-1536x1152.webp 1536w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_03-208x156.webp 208w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_03-175x131.webp 175w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_03-133x100.webp 133w\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-dominant-color=\"796b63\" data-has-transparency=\"false\" style=\"--dominant-color: #796b63;\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" data-id=\"21100\" src=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_02-1-1024x768.webp\" alt=\"Bagger in Aktion im Schwimmbecken\" class=\"wp-image-21100 not-transparent\" srcset=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_02-1-1024x768.webp 1024w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_02-1-500x375.webp 500w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_02-1-768x576.webp 768w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_02-1-1536x1152.webp 1536w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_02-1-208x156.webp 208w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_02-1-175x131.webp 175w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_02-1-133x100.webp 133w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_02-1.webp 1772w\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-dominant-color=\"a1a29a\" data-has-transparency=\"false\" style=\"--dominant-color: #a1a29a;\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" data-id=\"21098\" src=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_01-1-1024x768.webp\" alt=\"Bagger in Aktion auf dem Maaraue Gel\u00e4nde\" class=\"wp-image-21098 not-transparent\" srcset=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_01-1-1024x768.webp 1024w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_01-1-500x375.webp 500w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_01-1-768x576.webp 768w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_01-1-1536x1152.webp 1536w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_01-1-208x156.webp 208w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_01-1-175x131.webp 175w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_01-1-133x100.webp 133w, https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Bagger_01-1.webp 1772w\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">(The top image shows a model view of the project)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A historic swimming pool is set to be made fit for the future in 2026. The Maaraue outdoor swimming pool, which opened in 1965 and is a listed building, is showing significant structural defects after more than 60 years of operation.<\/p>\n","protected":false},"author":4,"featured_media":20095,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"pgc_sgb_lightbox_settings":"","footnotes":""},"categories":[5,50],"tags":[],"class_list":["post-20106","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general","category-maaraue-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Maaraue Outdoor Swimming Pool: A New Chapter &#8211; mattiaqua<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Maaraue Outdoor Swimming Pool: A New Chapter &#8211; mattiaqua\" \/>\n<meta property=\"og:description\" content=\"A historic swimming pool is set to be made fit for the future in 2026. The Maaraue outdoor swimming pool, which opened in 1965 and is a listed building, is showing significant structural defects after more than 60 years of operation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/\" \/>\n<meta property=\"og:site_name\" content=\"mattiaqua\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-19T13:42:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-10T07:19:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_header.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1657\" \/>\n\t<meta property=\"og:image:height\" content=\"640\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"hani\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"hani\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/\"},\"author\":{\"name\":\"hani\",\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/#\\\/schema\\\/person\\\/ec98e4dc7d0b56d942cb431fd8625adf\"},\"headline\":\"Maaraue Outdoor Swimming Pool: A New Chapter\",\"datePublished\":\"2026-03-19T13:42:15+00:00\",\"dateModified\":\"2026-08-10T07:19:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/\"},\"wordCount\":412,\"publisher\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mattiaqua.de\\\/wp-content\\\/uploads\\\/Maaraue_header.webp\",\"articleSection\":[\"General\",\"Maaraue\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/\",\"url\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/\",\"name\":\"Maaraue Outdoor Swimming Pool: A New Chapter &#8211; mattiaqua\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mattiaqua.de\\\/wp-content\\\/uploads\\\/Maaraue_header.webp\",\"datePublished\":\"2026-03-19T13:42:15+00:00\",\"dateModified\":\"2026-08-10T07:19:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.mattiaqua.de\\\/wp-content\\\/uploads\\\/Maaraue_header.webp\",\"contentUrl\":\"https:\\\/\\\/www.mattiaqua.de\\\/wp-content\\\/uploads\\\/Maaraue_header.webp\",\"width\":1657,\"height\":640,\"caption\":\"Modellansicht des Projektes\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/news\\\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Maaraue Outdoor Swimming Pool: A New Chapter\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/\",\"name\":\"mattiaqua\",\"description\":\"Eigenbetrieb der Landeshauptstadt Wiesbaden f\u00fcr Quellen, B\u00e4der, Freizeit\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/#organization\",\"name\":\"mattiaqua\",\"url\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mattiaqua.de\\\/wp-content\\\/uploads\\\/logo-blau.svg\",\"contentUrl\":\"https:\\\/\\\/www.mattiaqua.de\\\/wp-content\\\/uploads\\\/logo-blau.svg\",\"width\":1024,\"height\":1024,\"caption\":\"mattiaqua\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mattiaqua.de\\\/en\\\/#\\\/schema\\\/person\\\/ec98e4dc7d0b56d942cb431fd8625adf\",\"name\":\"hani\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Maaraue Outdoor Swimming Pool: A New Chapter &#8211; mattiaqua","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/","og_locale":"en_US","og_type":"article","og_title":"Maaraue Outdoor Swimming Pool: A New Chapter &#8211; mattiaqua","og_description":"A historic swimming pool is set to be made fit for the future in 2026. The Maaraue outdoor swimming pool, which opened in 1965 and is a listed building, is showing significant structural defects after more than 60 years of operation.","og_url":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/","og_site_name":"mattiaqua","article_published_time":"2026-03-19T13:42:15+00:00","article_modified_time":"2026-08-10T07:19:49+00:00","og_image":[{"width":1657,"height":640,"url":"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_header.webp","type":"image\/jpeg"}],"author":"hani","twitter_card":"summary_large_image","twitter_misc":{"Written by":"hani","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/#article","isPartOf":{"@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/"},"author":{"name":"hani","@id":"https:\/\/www.mattiaqua.de\/en\/#\/schema\/person\/ec98e4dc7d0b56d942cb431fd8625adf"},"headline":"Maaraue Outdoor Swimming Pool: A New Chapter","datePublished":"2026-03-19T13:42:15+00:00","dateModified":"2026-08-10T07:19:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/"},"wordCount":412,"publisher":{"@id":"https:\/\/www.mattiaqua.de\/en\/#organization"},"image":{"@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_header.webp","articleSection":["General","Maaraue"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/","url":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/","name":"Maaraue Outdoor Swimming Pool: A New Chapter &#8211; mattiaqua","isPartOf":{"@id":"https:\/\/www.mattiaqua.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/#primaryimage"},"image":{"@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_header.webp","datePublished":"2026-03-19T13:42:15+00:00","dateModified":"2026-08-10T07:19:49+00:00","breadcrumb":{"@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/#primaryimage","url":"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_header.webp","contentUrl":"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/Maaraue_header.webp","width":1657,"height":640,"caption":"Modellansicht des Projektes"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mattiaqua.de\/en\/news\/renovation-of-the-maaraue-outdoor-swimming-pool-during-the-2026-season\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.mattiaqua.de\/en\/"},{"@type":"ListItem","position":2,"name":"Maaraue Outdoor Swimming Pool: A New Chapter"}]},{"@type":"WebSite","@id":"https:\/\/www.mattiaqua.de\/en\/#website","url":"https:\/\/www.mattiaqua.de\/en\/","name":"mattiaqua","description":"Eigenbetrieb der Landeshauptstadt Wiesbaden f\u00fcr Quellen, B\u00e4der, Freizeit","publisher":{"@id":"https:\/\/www.mattiaqua.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mattiaqua.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mattiaqua.de\/en\/#organization","name":"mattiaqua","url":"https:\/\/www.mattiaqua.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mattiaqua.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/logo-blau.svg","contentUrl":"https:\/\/www.mattiaqua.de\/wp-content\/uploads\/logo-blau.svg","width":1024,"height":1024,"caption":"mattiaqua"},"image":{"@id":"https:\/\/www.mattiaqua.de\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.mattiaqua.de\/en\/#\/schema\/person\/ec98e4dc7d0b56d942cb431fd8625adf","name":"hani"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-08-31 09:21:40","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/posts\/20106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/comments?post=20106"}],"version-history":[{"count":11,"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/posts\/20106\/revisions"}],"predecessor-version":[{"id":21138,"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/posts\/20106\/revisions\/21138"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/media\/20095"}],"wp:attachment":[{"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/media?parent=20106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/categories?post=20106"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mattiaqua.de\/en\/wp-json\/wp\/v2\/tags?post=20106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}